Ghita Bencheikh

ServiceDEPARTEMENT SCIENTIFIQUE SYSTEMES, DIRECTION DE LA FORMATION ET DE LA VIE ETUDIANTE

Publications

1. This is an institutional or departmental repository. 2. OATAO (Open Archive Toulouse Archive Ouverte) holds all types of materials. 3. Papers may include: (a) unpublished pre-prints (not peer-reviewed) (b) final peer-reviewed drafts (post-prints) (c) published versions 4. Principal Languages: English; French

Planification conjointe des activités de production et de maintenance en fonction de l'état de santé des ressources

9 mars 2020 08:32 - oatao: No conditions. Results ordered -Date Deposited.

Bencheikh, Ghita. Planification conjointe des activités de production et de maintenance en fonction de l'état de santé des ressources. PhD, Génie industriel, Institut National Polytechnique de Toulouse, 2020

Voir la publication en ligne

Étude de l’apport de bassins contrôlés pour la diminution des inondations suite aux crues

16 mai 2019 14:33 - oatao: No conditions. Results ordered -Date Deposited.

Bencheikh, Ghita and Tahiri, Ayoub and Chiron, Pascale and Archimède, Bernard and Martignac, Francis. Étude de l’apport de bassins contrôlés pour la diminution des inondations suite aux crues. (2017) In: ROADEF 2017, 18ème conférence ROADEF de la Société Française de Recherche Opérationnelle et d'Aide à la Décision, 22 February 2017 - 24 February 2017 (Metz, France). (Unpublished)

Voir la publication en ligne

A flood decrease strategy based on flow network coupled with a hydraulic simulation software

27 nov. 2018 09:10 - oatao: No conditions. Results ordered -Date Deposited.

Bencheikh, Ghita and Tahiri, Ayoub and Chiron, Pascale and Archimède, Bernard and Martignac, Francis. A flood decrease strategy based on flow network coupled with a hydraulic simulation software. (2017) IFAC-PapersOnLine, 50 (1). 3171-3176. ISSN 2405-8963

Voir la publication en ligne

Scheduling of production and maintenance activities using multi-agents system

16 oct. 2018 09:26 - oatao: No conditions. Results ordered -Date Deposited.

Bencheikh, Ghita and Letouzey, Agnès and Desforges, Xavier. Scheduling of production and maintenance activities using multi-agents system. ( In Press: 2018) In: ETFA 2018, 4 September 2018 - 7 September 2018 (Torino, Italy).

Voir la publication en ligne

Process for joint scheduling based on health assessment of technical resources

10 oct. 2018 08:10 - oatao: No conditions. Results ordered -Date Deposited.

Bencheikh, Ghita and Letouzey, Agnès and Desforges, Xavier. Process for joint scheduling based on health assessment of technical resources. (2018) In: SAFEPROCESS 2018, 29 August 2018 - 31 August 2018 (Warsaw, Poland).

Voir la publication en ligne

Contactez l'ENI de Tarbes

47, avenue d'Azereix - BP 1629 - 65016 Tarbes CEDEX

+33 (0)5 62 44 27 00

  • Région Occitanie
  • Erasmus +
  • Logo midisup
  • Logo CGE
  • Logo UTFTMP
  • Logo CTI
  • Logo CDEFI
  • Logo MENESR
  • Bienvenue en France
  • certification_FCU_N_FdC
  • EUR-ACE